Source Review: Marcy 2026 — The Impact of Computing Data Centres Orbiting Earth
Overall verdict: Consistent
Two-sentence summary: Marcy's 100 GW US AI compute demand by 2035 projection is the most-cited authoritative figure underlying q6.c2's TAI-C SDC scenario. The paper's astronomy-impact analysis is tangential to q6's mass-demand question but reinforces orbital-debris and collision-risk considerations relevant for q6.c14 bandwidth + congestion ceiling.
Key claims
US data center power demand >100 GW by 2035 → Consistent. Directly underlies q6.c2 TAI-C 1,000 GW scenario by extrapolation (orbital DC captures fraction of full demand). Also corroborates scientificamerican-2026-sdc.
5 GW orbital facility = 4×4 km array → Consistent. Implies ~12.5 kg/m² total system mass density at the SDC 40 t/MW range (5 GW × 40 t/MW = 200,000 t in 16 km² → 12.5 kg/m²). Marcy's geometric description is plausible for thin-film panels with integrated radiator + structure mass.
Orbital-brightness magnitude g = -5 to -7 → Consistent (tangential to q6). The astronomy concern reinforces that aggressive scale-up faces non-launch-cost constraints.
Visibility window 1.5 h post-sunset / pre-sunrise → Not directly relevant to q6 mass-demand; orientation context.
Collision-and-debris risk for multiple structures → Consistent with q6.c13's industrial-explosion debris-mitigation implication.
Anti-hallucination check
Quotes appear in extract.md ✓. Single-author preprint; not peer-reviewed yet (submitted to MNRAS Letters). Tier A by venue ambiguity; full submission status as of fetch is "submitted." Future iteration should re-check publication status.
Notes
Marcy's 2026 preprint is one of two tier A sources; the load-bearing contribution is the 100 GW US demand baseline. The astronomy-impact section is tangential to q6 but valuable for q5 / q8 synthesis of non-mass-demand constraints on orbital build-out.